{"id":28289,"date":"2023-11-21T13:19:04","date_gmt":"2023-11-21T12:19:04","guid":{"rendered":"https:\/\/evropskasredstva.si\/?post_type=media_blog&#038;p=28289"},"modified":"2024-02-12T13:20:37","modified_gmt":"2024-02-12T12:20:37","slug":"eu-funding-for-a-cycle-route-between-zalec-and-rogatec","status":"publish","type":"media_blog","link":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/","title":{"rendered":"EU funding for a cycle route between \u017dalec and Rogatec \u00a0"},"content":{"rendered":"\n<div class=\"wp-block-eu-skladi-container-block container\"><div class=\"row\"><div class=\"col-md-12\"><div class=\"content_outer\">\n<p><strong>Ljubljana, 21 November 2023 \u2013 The Ministry of Cohesion and Regional Development has approved EU funding for the project \u017dalec-Rogatec Cycle Route.<\/strong><\/p>\n\n\n\n<p>As part of the project, the Slovenian Infrastructure Agency will establish a cycle route between \u017dalec and Rogatec, divided into two sections, namely, \u017dalec-Celje and \u0160entjur-Rogatec. The EU co-funded project will result in new cycle surfaces being built, and in areas where this is not possible or economical, in cycle routes being established along existing roads with low traffic volumes. The area will be adequately signposted, and rest areas will be built on steeper sections.<\/p>\n\n\n\n<p><br>Most of the \u017dalec-Celje section, which will start at the bridge for \u0160e\u0161\u010de and end at the Partizanska cesta Street on the right bank of the Savinja River in Celje, will run on a high-water embankment on the left bank of the Savinja River as a new construction \u2013 the total length of this cycle section will be 11.03 kilometres. The \u0160entjur-Rogatec section will link up with the existing Celje-\u0160tore-\u0160entjur cycle route project at \u0160entjur and will end at the Open Air Museum Rogatec. The total length of this cycling section will be 16.04 kilometres. The \u017dalec-Rogatec cycle route will thus cover 27.07 kilometres, of which 19.42 kilometres are planned as a new construction.<\/p>\n\n\n\n<p><br>The Cohesion Fund contribution for the project, which is worth EUR 14,645,741.00, stands at almost EUR 12.5 million, i.e., EUR 12,448,879.85.<\/p>\n<\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":25,"featured_media":748,"parent":0,"template":"","class_list":["post-28289","media_blog","type-media_blog","status-publish","has-post-thumbnail","hentry","media_type-sporocila-za-javnost-en"],"aioseo_notices":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EU funding for a cycle route between \u017dalec and Rogatec \u00a0 - Evropska sredstva<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EU funding for a cycle route between \u017dalec and Rogatec \u00a0 - Evropska sredstva\" \/>\n<meta property=\"og:url\" content=\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/\" \/>\n<meta property=\"og:site_name\" content=\"Evropska sredstva\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/EUsredstva\/\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-12T12:20:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1300\" \/>\n\t<meta property=\"og:image:height\" content=\"865\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@mkrrSI\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/\",\"url\":\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/\",\"name\":\"EU funding for a cycle route between \u017dalec and Rogatec \u00a0 - Evropska sredstva\",\"isPartOf\":{\"@id\":\"https:\/\/evropskasredstva.si\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg\",\"datePublished\":\"2023-11-21T12:19:04+00:00\",\"dateModified\":\"2024-02-12T12:20:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#primaryimage\",\"url\":\"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg\",\"contentUrl\":\"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg\",\"width\":1300,\"height\":865},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Domov\",\"item\":\"https:\/\/evropskasredstva.si\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Media Center\",\"item\":\"https:\/\/evropskasredstva.si\/en\/media-center\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"EU funding for a cycle route between \u017dalec and Rogatec \u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/evropskasredstva.si\/en\/#website\",\"url\":\"https:\/\/evropskasredstva.si\/en\/\",\"name\":\"Evropska sredstva\",\"description\":\"Evropski strukturni in investicijski skladi\",\"publisher\":{\"@id\":\"https:\/\/evropskasredstva.si\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/evropskasredstva.si\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/evropskasredstva.si\/en\/#organization\",\"name\":\"Ministrstvo za kohezijo in regionalni razvoj\",\"url\":\"https:\/\/evropskasredstva.si\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/evropskasredstva.si\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/evropskasredstva.si\/app\/uploads\/2023\/03\/logo-e1678780179257.png\",\"contentUrl\":\"https:\/\/evropskasredstva.si\/app\/uploads\/2023\/03\/logo-e1678780179257.png\",\"width\":3232,\"height\":1695,\"caption\":\"Ministrstvo za kohezijo in regionalni razvoj\"},\"image\":{\"@id\":\"https:\/\/evropskasredstva.si\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/EUsredstva\/\",\"https:\/\/x.com\/mkrrSI\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EU funding for a cycle route between \u017dalec and Rogatec \u00a0 - Evropska sredstva","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/","og_locale":"en_US","og_type":"article","og_title":"EU funding for a cycle route between \u017dalec and Rogatec \u00a0 - Evropska sredstva","og_url":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/","og_site_name":"Evropska sredstva","article_publisher":"https:\/\/www.facebook.com\/EUsredstva\/","article_modified_time":"2024-02-12T12:20:37+00:00","og_image":[{"width":1300,"height":865,"url":"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@mkrrSI","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/","url":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/","name":"EU funding for a cycle route between \u017dalec and Rogatec \u00a0 - Evropska sredstva","isPartOf":{"@id":"https:\/\/evropskasredstva.si\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#primaryimage"},"image":{"@id":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#primaryimage"},"thumbnailUrl":"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg","datePublished":"2023-11-21T12:19:04+00:00","dateModified":"2024-02-12T12:20:37+00:00","breadcrumb":{"@id":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#primaryimage","url":"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg","contentUrl":"https:\/\/evropskasredstva.si\/app\/uploads\/2021\/07\/slika-kolesarjev.jpeg","width":1300,"height":865},{"@type":"BreadcrumbList","@id":"https:\/\/evropskasredstva.si\/en\/media-center\/sporocila-za-javnost-en\/eu-funding-for-a-cycle-route-between-zalec-and-rogatec\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Domov","item":"https:\/\/evropskasredstva.si\/en\/"},{"@type":"ListItem","position":2,"name":"Media Center","item":"https:\/\/evropskasredstva.si\/en\/media-center\/"},{"@type":"ListItem","position":3,"name":"EU funding for a cycle route between \u017dalec and Rogatec \u00a0"}]},{"@type":"WebSite","@id":"https:\/\/evropskasredstva.si\/en\/#website","url":"https:\/\/evropskasredstva.si\/en\/","name":"Evropska sredstva","description":"Evropski strukturni in investicijski skladi","publisher":{"@id":"https:\/\/evropskasredstva.si\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/evropskasredstva.si\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/evropskasredstva.si\/en\/#organization","name":"Ministrstvo za kohezijo in regionalni razvoj","url":"https:\/\/evropskasredstva.si\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/evropskasredstva.si\/en\/#\/schema\/logo\/image\/","url":"https:\/\/evropskasredstva.si\/app\/uploads\/2023\/03\/logo-e1678780179257.png","contentUrl":"https:\/\/evropskasredstva.si\/app\/uploads\/2023\/03\/logo-e1678780179257.png","width":3232,"height":1695,"caption":"Ministrstvo za kohezijo in regionalni razvoj"},"image":{"@id":"https:\/\/evropskasredstva.si\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/EUsredstva\/","https:\/\/x.com\/mkrrSI"]}]}},"_links":{"self":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/media_blog\/28289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/media_blog"}],"about":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/types\/media_blog"}],"author":[{"embeddable":true,"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/users\/25"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/media\/748"}],"wp:attachment":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/media?parent=28289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}