{"id":48225,"date":"2023-12-28T07:51:00","date_gmt":"2023-12-28T06:51:00","guid":{"rendered":"https:\/\/evropskasredstva.si\/projects\/all-projects\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/"},"modified":"2026-06-12T07:55:34","modified_gmt":"2026-06-12T05:55:34","slug":"a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing","status":"publish","type":"project","link":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","title":{"rendered":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n<div class=\"wp-block-eu-skladi-container-block container\"><div class=\"row\"><div class=\"col-md-12\"><div class=\"content_outer\">\n<p class=\"wp-block-paragraph\">The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first phase involved the construction of the four-lane highway between Dra\u017eenci and Podlehnik, while the second phase extended from Podlehnik to the Gru\u0161kovje border crossing. A total of 90 structures were built as part of the project, namely 7 overpasses (total length 1,092.20 m), 3 underpasses (total length 235.48 m), 2 underpasses (total length 56.99 m), 24 bridges (total length 890.17 m), 1 tunnel 105 m long, 22 major culverts (total length 663.71 m), 31 retaining and support structures (total length 1,719.29 m), and noise barriers with a total length of 8,415 m and a height ranging from 2.50 m to 4.00 metres.   <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before the construction of the Dra\u017eenci\u2013MMP Gru\u0161kovje motorway section, all traffic travelled along the G1-9 main road through several settlements with a combined population of more than 7,000 people. The environment was burdened by noise emissions and polluted by lubricants, exhaust fumes, greenhouse gas emissions, soil and groundwater contamination, vibrations, and light pollution. With the constant growth in traffic volumes and the already constructed Slivnica\u2013Dra\u017eenci motorway section, traffic volumes toward the Gru\u0161kovje MMP have increased even further, particularly during the summer tourist season, when the main road\u2019s capacity was severely exceeded (constant traffic jams).  <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The completed Dra\u017eenci\u2013MMP Gru\u0161kovje motorway is of great national importance, as it represents the missing link in the Maribor\u2013Zagreb road corridor. The new highway has significantly improved transportation connectivity, reduced travel time, enhanced travel quality and traffic safety (the number of traffic accidents has dropped significantly), lowered noise emissions and harmful environmental impacts. The motorway also has a positive impact on regional development. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Following the construction of the Dra\u017eenci\u2013Gru\u0161kovje motorway section, most of the existing traffic has been diverted to the motorway. Driving on the motorway is smoother (with less braking and acceleration) and reduces the impact of noise and particulate matter pollution. Noise barriers were installed along the highway to protect residents of nearby communities. It is estimated that the environmental impact following the motorway\u2019s construction is smaller and more controlled, which ensures better living conditions for the local population and increases traffic safety.   <\/p>\n<\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":0,"parent":0,"template":"","class_list":["post-48225","project","type-project","status-publish","hentry","project_category-success-stories"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Evropska sredstva - Evropski strukturni in investicijski skladi\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva\" \/>\n\t\t<meta property=\"og:description\" content=\"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-12-28T06:51:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-06-12T05:55:34+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/#listItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/#listItem\",\"name\":\"Success Stories\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/#listItem\",\"position\":3,\"name\":\"Success Stories\",\"item\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/#listItem\",\"name\":\"A4 Motorway: Slivnica\\u2013Gru\\u0161kovje: Dra\\u017eenci\\u2013Gru\\u0161kovje International Border Crossing\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/#listItem\",\"position\":4,\"name\":\"A4 Motorway: Slivnica\\u2013Gru\\u0161kovje: Dra\\u017eenci\\u2013Gru\\u0161kovje International Border Crossing\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/#listItem\",\"name\":\"Success Stories\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#organization\",\"name\":\"Evropska sredstva\",\"description\":\"Evropski strukturni in investicijski skladi\",\"url\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/#webpage\",\"url\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/\",\"name\":\"A4 Motorway: Slivnica\\u2013Gru\\u0161kovje: Dra\\u017eenci\\u2013Gru\\u0161kovje International Border Crossing - Evropska sredstva\",\"description\":\"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/#breadcrumblist\"},\"datePublished\":\"2023-12-28T07:51:00+01:00\",\"dateModified\":\"2026-06-12T07:55:34+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/\",\"name\":\"Evropska sredstva\",\"description\":\"Evropski strukturni in investicijski skladi\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva","description":"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first","canonical_url":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/evropskasredstva.si\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/#listItem","position":2,"name":"Projects","item":"https:\/\/evropskasredstva.si\/en\/projects\/","nextItem":{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/#listItem","name":"Success Stories"},"previousItem":{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/#listItem","position":3,"name":"Success Stories","item":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/","nextItem":{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/#listItem","name":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing"},"previousItem":{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/#listItem","position":4,"name":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing","previousItem":{"@type":"ListItem","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/#listItem","name":"Success Stories"}}]},{"@type":"Organization","@id":"https:\/\/evropskasredstva.si\/en\/#organization","name":"Evropska sredstva","description":"Evropski strukturni in investicijski skladi","url":"https:\/\/evropskasredstva.si\/en\/"},{"@type":"WebPage","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/#webpage","url":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","name":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva","description":"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/evropskasredstva.si\/en\/#website"},"breadcrumb":{"@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/#breadcrumblist"},"datePublished":"2023-12-28T07:51:00+01:00","dateModified":"2026-06-12T07:55:34+02:00"},{"@type":"WebSite","@id":"https:\/\/evropskasredstva.si\/en\/#website","url":"https:\/\/evropskasredstva.si\/en\/","name":"Evropska sredstva","description":"Evropski strukturni in investicijski skladi","inLanguage":"en-US","publisher":{"@id":"https:\/\/evropskasredstva.si\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Evropska sredstva - Evropski strukturni in investicijski skladi","og:type":"article","og:title":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva","og:description":"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first","og:url":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","article:published_time":"2023-12-28T06:51:00+00:00","article:modified_time":"2026-06-12T05:55:34+00:00","twitter:card":"summary_large_image","twitter:title":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva","twitter:description":"The completed motorway is a four-lane road with a total length of 13.031 km, a cross-section of 27.00 m, and three interchanges in Lancova vas, Podlehnik, and Zaklo, as well as a service station on both sides of the highway named Podlehnik. The construction of the new motorway took place in two phases. The first"},"aioseo_meta_data":{"post_id":"48225","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-06-12 05:51:20","updated":"2026-06-12 10:02:17","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/evropskasredstva.si\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/evropskasredstva.si\/en\/projects\/\" title=\"Projects\">Projects<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/\" title=\"Success Stories\">Success Stories<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tA4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/evropskasredstva.si\/en\/"},{"label":"Projects","link":"https:\/\/evropskasredstva.si\/en\/projects\/"},{"label":"Success Stories","link":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/"},{"label":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing","link":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva\" \/>\n<meta property=\"og:url\" content=\"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/\" \/>\n<meta property=\"og:site_name\" content=\"Evropska sredstva\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/EUsredstva\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T05:55:34+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@mkrrSI\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/\",\"url\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/\",\"name\":\"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#website\"},\"datePublished\":\"2023-12-28T06:51:00+00:00\",\"dateModified\":\"2026-06-12T05:55:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/success-stories\\\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Domov\",\"item\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/\",\"name\":\"Evropska sredstva\",\"description\":\"Evropski strukturni in investicijski skladi\",\"publisher\":{\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#organization\",\"name\":\"Ministrstvo za kohezijo in regionalni razvoj\",\"url\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/evropskasredstva.si\\\/app\\\/uploads\\\/2023\\\/03\\\/logo-e1678780179257.png\",\"contentUrl\":\"https:\\\/\\\/evropskasredstva.si\\\/app\\\/uploads\\\/2023\\\/03\\\/logo-e1678780179257.png\",\"width\":3232,\"height\":1695,\"caption\":\"Ministrstvo za kohezijo in regionalni razvoj\"},\"image\":{\"@id\":\"https:\\\/\\\/evropskasredstva.si\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/EUsredstva\\\/\",\"https:\\\/\\\/x.com\\\/mkrrSI\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","og_locale":"en_US","og_type":"article","og_title":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva","og_url":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","og_site_name":"Evropska sredstva","article_publisher":"https:\/\/www.facebook.com\/EUsredstva\/","article_modified_time":"2026-06-12T05:55:34+00:00","twitter_card":"summary_large_image","twitter_site":"@mkrrSI","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","url":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/","name":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing - Evropska sredstva","isPartOf":{"@id":"https:\/\/evropskasredstva.si\/en\/#website"},"datePublished":"2023-12-28T06:51:00+00:00","dateModified":"2026-06-12T05:55:34+00:00","breadcrumb":{"@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/evropskasredstva.si\/en\/projects\/success-stories\/a4-motorway-slivnica-gruskovje-drazenci-gruskovje-international-border-crossing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Domov","item":"https:\/\/evropskasredstva.si\/en\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/evropskasredstva.si\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"A4 Motorway: Slivnica\u2013Gru\u0161kovje: Dra\u017eenci\u2013Gru\u0161kovje International Border Crossing"}]},{"@type":"WebSite","@id":"https:\/\/evropskasredstva.si\/en\/#website","url":"https:\/\/evropskasredstva.si\/en\/","name":"Evropska sredstva","description":"Evropski strukturni in investicijski skladi","publisher":{"@id":"https:\/\/evropskasredstva.si\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/evropskasredstva.si\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/evropskasredstva.si\/en\/#organization","name":"Ministrstvo za kohezijo in regionalni razvoj","url":"https:\/\/evropskasredstva.si\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/evropskasredstva.si\/en\/#\/schema\/logo\/image\/","url":"https:\/\/evropskasredstva.si\/app\/uploads\/2023\/03\/logo-e1678780179257.png","contentUrl":"https:\/\/evropskasredstva.si\/app\/uploads\/2023\/03\/logo-e1678780179257.png","width":3232,"height":1695,"caption":"Ministrstvo za kohezijo in regionalni razvoj"},"image":{"@id":"https:\/\/evropskasredstva.si\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/EUsredstva\/","https:\/\/x.com\/mkrrSI"]}]}},"_links":{"self":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/project\/48225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:attachment":[{"href":"https:\/\/evropskasredstva.si\/en\/wp-json\/wp\/v2\/media?parent=48225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}